| Place of Origin |
Guangdong China (Mainland) |
| Brand Name |
SHIELDER |
| Model Number |
CB-300 |
Itis applied to the construction joint which haven't moved or just have moved a little. It commonly used in floors, walls, and underground slabs. C-250 is applied to reservoir, dam, under tunnel and the place that is high water pressure.C-200is generally used in walls and under slabs, and the water pressure it needs to endure is higher than that of W150.C-150 is applied to the construction joint which haven't moved or just have moved a little. It commonly used in floors, walls, and underground slabs.